← Regulations in context

Colombia · Fictional case

The road lighting file

Review the documents for a road lighting purchase and installation in Colombia. Decide what each one shows.

Product · 1/3

Which annex covers the quoted model?

Purchasing has a quote for the 70 W V-70-B. Read the two annexes and the data sheet. Attach the document that includes this variant in the scope of the exercise certificate.

Simulated excerptA-12

Certificate annex

Models covered
V-70-A
Power
70 W
Declared family
V family · 1 variant

Simulated excerptF-03

Data sheet

Model
V-70-B
Power
70 W
Issued by
Fictional supplier

Simulated excerptA-18

Certificate annex

Models covered
V-70-A · V-70-B
Power
70 W
Declared family
V family · 2 variants

Installation · 2/3

What was measured on section 07?

Installation on section 07 finished on 4 September. The site team wants the record of readings taken there after installation. Compare the section, date and data source.

Simulated excerptM-24

Field record

Road section
07
Date
8 Sep 2026
Data source
On-site readings at grid points marked on the plan

Simulated excerptD-07

Design calculation

Road section
07
Date
28 Aug 2026
Data source
Simulation using photometry and design geometry

Simulated excerptM-25

Field record

Road section
08
Date
8 Sep 2026
Data source
On-site readings at grid points marked on the plan

Changed installation · 3/3

The luminaires were tilted

On 7 October the same luminaires on section 07 were re-aimed. Choose the document you would add to see how the road was lit after that change.

Simulated excerptM-24

Field record

Road section
07
Date
8 Sep 2026
Data source
On-site readings at grid points marked on the plan

Simulated excerptM-31

Field record

Road section
07
Date
10 Oct 2026
Data source
On-site readings at grid points marked on the plan

Simulated excerptA-18

Certificate annex

Models covered
V-70-A · V-70-B
Power
70 W
Model
V-70-B