Review the documents for a road lighting purchase and installation in Colombia. Decide what each one shows.
Attached documents
Product · 1/3
Which annex covers the quoted model?
Purchasing has a quote for the 70 W V-70-B. Read the two annexes and the data sheet. Attach the document that includes this variant in the scope of the exercise certificate.
Simulated excerptA-12
Certificate annex
Models covered
V-70-A
Power
70 W
Declared family
V family · 1 variant
Simulated excerptF-03
Data sheet
Model
V-70-B
Power
70 W
Issued by
Fictional supplier
Simulated excerptA-18
Certificate annex
Models covered
V-70-A · V-70-B
Power
70 W
Declared family
V family · 2 variants
Installation · 2/3
What was measured on section 07?
Installation on section 07 finished on 4 September. The site team wants the record of readings taken there after installation. Compare the section, date and data source.
Simulated excerptM-24
Field record
Road section
07
Date
8 Sep 2026
Data source
On-site readings at grid points marked on the plan
Simulated excerptD-07
Design calculation
Road section
07
Date
28 Aug 2026
Data source
Simulation using photometry and design geometry
Simulated excerptM-25
Field record
Road section
08
Date
8 Sep 2026
Data source
On-site readings at grid points marked on the plan
Changed installation · 3/3
The luminaires were tilted
On 7 October the same luminaires on section 07 were re-aimed. Choose the document you would add to see how the road was lit after that change.
Simulated excerptM-24
Field record
Road section
07
Date
8 Sep 2026
Data source
On-site readings at grid points marked on the plan
Simulated excerptM-31
Field record
Road section
07
Date
10 Oct 2026
Data source
On-site readings at grid points marked on the plan
Simulated excerptA-18
Certificate annex
Models covered
V-70-A · V-70-B
Power
70 W
Model
V-70-B
Your road lighting file
A-18
Product
A-18 explicitly lists V-70-B. For a real purchase you would also check the authenticity, validity and full scope of the applicable document.
M-24
Installation
M-24 records measurements on section 07 after installation. Assessing the result requires the full report, applicable criteria and test conditions.
M-31
Changed installation
M-31 covers the right section and the new aiming. Keep M-24 as a baseline for comparing both installations under documented conditions.
You identified the model and the section records before and after the change. A conformity conclusion requires review of the full file under the applicable scope and rules.