Two tasks, one shift
Change the time spent cutting and packing. Predict which task contributes more sound energy and find the equivalent level for the period.

Simulated scenario. A worker alternates between two tasks with constant sound levels at their position. The calculation covers only the minutes you enter.
Set the task times
Observed time
Period comparison
Share of observed time
Cutting Packing
Choose an answer to see the comparison.
Share of total sound energy
In this example, one minute of cutting contributes as much energy as ten minutes of packing.
How the equivalent level is calculated
For each task, multiply its duration by 10 raised to the power of (level in decibels divided by 10). Add the contributions, divide by the total duration and take ten times the base-ten logarithm of the result.
Ten minutes of cutting at 90 dB(A) and one hundred minutes of packing at 80 dB(A) contribute equal amounts of energy. The equivalent level for those 110 minutes is 82.6 dB(A).